                      玻璃鋼防腐管道安裝要求
                      時間:2022-07-05  瀏覽:5403次

                        Requirements for installation of FRP pipes

                        1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

                        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

                        2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

                        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

                        3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

                        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

                        4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

                        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

                        5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

                        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

                        6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

                        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

                        7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

                        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


                      主站蜘蛛池模板: 成人影院yy111111在线| 亚洲第一区二区快射影院| 可以看三级的网站| 精品国产sm最大网免费站| 妺妺窝人体色www在线直播| 国产精品美女久久久久久| 日本一二免费不卡区| 久久一本人碰碰人碰| 小雪好紧好滑好湿好爽视频| 亚洲精品午夜理伦不卡在线观看| 日韩秘 无码一区二区三区| 国产乱人激情h在线观看| 午夜伦理yy44008影院| 日韩欧国产美一区二区在线| www国产亚洲精品久久网站| 国产日韩在线观看不卡顿 | 免费无码鲁丝片一区二区| 亚洲a∨天堂男人无码| 999国产精品一区二区| 日本三级香港三级人妇99| 亚洲精品国产自在现线看| 国产av无码专区亚洲av软件| 性一交一乱一乱一视频| 中文字幕无码人妻波多野结衣 | 亚洲午夜福利AV一区二区无码 | 久久理论片琪琪电影院| 日韩剧情片电影网站| 精久国产一区二区三区四区| 一区二区三区免费视频播放器| 日韩中文字幕v亚洲中文字幕| 一本大道无码高清| 亚洲精品一区二区久| 日韩一卡2卡3卡4卡新区亚洲 | 另类老妇奶性生bbwbbw| 日韩av人人夜夜澡人人爽| 亚洲综合不卡一区二区三区| 亚洲18禁私人影院| 国产人免费视频在线观看| 99久久精品久久久久久清纯| 一级二级三一片内射视频在线| 永久免费精品成人网站|